@article{e2be972f0d8a4ee1be5d8da29759d195,
title = "Erratum: Staged Reconstruction (Delayed-Immediate) of the Maxillectomy Defect Using CAD/CAM Technology (Journal of Reconstructive Microsurgery (2017) DOI: 10.1055/s-0037-1607394)",
abstract = "It has been brought to the Publisher's attention that for author {"}Mark W. Kubik{"} his last name {"}Kubik{"} was misspelled incorrectly as {"}Kubic{"} in the above-mentioned article, published in J Reconstruct Microsurg efirst ahead of print on November 27, 2017. DOI of the original article is DOI: 10.1055/s-0037-1607394. The name should be listed {"}Mark W. Kubik{"}.",
author = "Pang, {John Henry} and Sebastian Brooke and Kubik, {Mark W.} and Ferris, {Robert L.} and Matilda Dhima and Hanasono, {Matthew M.} and Wang, {Eric W.} and Solari, {Mario G.}",
note = "Publisher Copyright: {\textcopyright} 2018 by Thieme Medical Publishers, Inc.",
year = "2018",
month = mar,
day = "12",
doi = "10.1055/s-0038-1635090",
language = "English (US)",
volume = "34",
pages = "E1",
journal = "Journal of Reconstructive Microsurgery",
issn = "0743-684X",
publisher = "Thieme Medical Publishers",
number = "3",
}