Skip to main navigation Skip to search Skip to main content

T helper 17 cells play a critical pathogenic role in lung cancer

  • Seon Hee Chang
  • , Seyedeh Golsar Mirabolfathinejad
  • , Harshadadevi Katta
  • , Amber M. Cumpian
  • , Lei Gong
  • , Mauricio S. Caetano
  • , Seyed Javad Moghaddam
  • , Chen Dong

Research output: Contribution to journalArticlepeer-review

Abstract

Lung cancer development is associated with extensive pulmonary inflammation. In addition, the linkage between chronic obstructive pulmonary disease (COPD) and lung cancer has been demonstrated in population-based studies. IL-17-producing CD4 helper T cells (Th17 cells) play a critical role in promoting chronic tissue inflammation. Although Th17 cells are found in human COPD and lung cancer, their role is not understood. We have thus used a mouse model of lung cancer, in which an oncogenic form of K-ras (K-rasG12D), frequently found in human lung cancer, is restrictedly expressed in lung epithelial cells [via Clara cell secretory protein (CCSPcre)]. In this model, Th17 and Treg but not Th1 cells were found enriched at the tumor tissues. When CCSPcre/K-rasG12D mice were weekly challenged with a lysate of nontypeable Haemophilus influenza (NTHi), which induces COPD-type inflammation and accelerates the tumor growth, they showed greatly enhanced Th17 cell infiltration in the lung tissues. Lack of IL-17, but not IL-17F, resulted in a significant reduction in lung tumor numbers in CCSPcre/K-rasG12D mice and also those treated with NTHi. Absence of IL-17 not only resulted in reduction of tumor cell proliferation and angiogenesis, but also decreased the expression of proinflammatory mediators and reduced recruitment of myeloid cells. Depletion of Gr-1+CD11b+ myeloid cells in CCSPcre/K-rasG12D mice suppressed tumor growth in lung, indicating Gr-1+CD11b+ myeloid cells recruited by IL-17 play a protumor role. Taken together, our data demonstrate a critical role for Th17 cell-mediated inflammation in lung tumorigenesis and suggest a novel way for prevention and treatment of this disease.

Original languageEnglish (US)
Pages (from-to)5664-5669
Number of pages6
JournalProceedings of the National Academy of Sciences of the United States of America
Volume111
Issue number15
DOIs
StatePublished - Apr 15 2014

Keywords

  • Interleukin 17
  • Lung adenocarcinoma

ASJC Scopus subject areas

  • General

MD Anderson CCSG core facilities

  • Flow Cytometry and Cellular Imaging Facility
  • Genetically Engineered Mouse Facility
  • Research Animal Support Facility

Fingerprint

Dive into the research topics of 'T helper 17 cells play a critical pathogenic role in lung cancer'. Together they form a unique fingerprint.

Cite this